Copper cables, inverters, entire transformers: solar parks in Germany are stolen from regularly. For the investor, the material is often the smaller item. The weeks without feed-in cost more, because the EEG pays nothing for them. The other question is whether the loss lands with the construction contractor, the insurer or the investor. With our own calculation, legal references and a list of questions for the operator.

Jakob HubertJakob HubertPublished 18 November 2026~10 min read

A solar park usually sits far out in the country, surrounded by fields, with nobody there at night. On site there are kilometres of copper and aluminium cable, plus inverters and, in the grid connection station, a transformer. Anyone who gets in finds saleable metal in large quantities. Police reports from several German states show that this is being exploited.

For you as a direct investor, the value of the stolen material matters less. What matters is how long the park is down afterwards, who pays for the damage and how much of it ends up with you. That is the subject here, with our own calculation of lost revenue.

How often are solar parks stolen from?

Nobody knows exactly, because there are no statistics on it. The German police crime statistics record the stolen good as "metal", split into non-ferrous and precious metal. They do not record whether it came from a solar park, a building site or a railway line; the Bremen state government confirmed this in January 2026 in reply to a parliamentary question. There is therefore no reliable national figure for theft from solar parks.

What does exist are individual police reports. In the Harz region, five transformers were stolen from a solar park between April and May 2026, worth around 220,000 euros according to the police. In the Börde district, offenders cut cables in 16 module rows in January 2026, with damage estimated at around 40,000 euros. Reports like these appear regularly, mostly from rural areas with many ground-mounted parks. They do not reveal a trend, but they do show a pattern: thieves take what can be turned into cash quickly.

What gets stolen from a solar park?

Mainly copper. The DC cables between the module rows and the inverters, the AC cables to the station and the earthing conductors consist wholly or partly of it. Next come inverters, which can be unscrewed and resold, and components from the grid connection station. Modules themselves are a less frequent target: they are heavy, fragile and, since prices fell in recent years, have little resale value.

Where in the park the theft happens determines the loss. If the cables of a few module rows are missing, part of the capacity drops out and the rest keeps feeding in. If the transformer is gone or the grid connection station is damaged, the whole park stops. A transformer is also not a stock item delivered the next day; replacing one can take weeks to months.

Why does theft cost more than the stolen material?

Because the park earns nothing until it is repaired and the EEG does not fill the gap. The entitlement to the market premium exists for power generated in the plant and sold through direct marketing (§ 19(1) and § 20 EEG). If nothing is fed in, no entitlement arises, whatever the reason. The law only provides compensation for lost feed-in where the grid operator itself curtails the plant (§ 13a EnWG); how that works is explained in the article on curtailment and redispatch. Theft is not such a case.

How much is lost depends on the season. We modelled a one-megawatt park at a site in central Germany, using the hourly exchange prices of 2025 and a reference value (anzulegender Wert) of 4.79 cents. It earns around 51,800 euros a year. A day of downtime costs 134 euros on average in June, 80 euros in January and 46 euros in December.

DowntimeStarting 1 MayStarting 1 November
2 weeks€2,228 (4.3 %)€925 (1.8 %)
6 weeks€6,106 (11.8 %)€2,882 (5.6 %)
12 weeks€15,262 (29.5 %)€3,704 (7.2 %)
Lost revenue per megawatt of park capacity for a total outage, share of annual revenue in brackets. If only part of the fields fails, the amount falls in the same proportion. Own calculation of 18.11.2026: yield from PVGIS (weather year 2023, south 20°, 14 % losses), day-ahead prices 2025 (SMARD), reference value 4.79 ct/kWh, market premium against the 2025 annual solar market value of 4.508 ct/kWh, no revenue in negative-price hours; excluding marketing fee and degradation. Not a forecast.

For a ten-megawatt park, a total outage of six weeks from the start of May would mean around 61,000 euros less revenue. If only the cables of a third of the fields are missing, it is a third of that. The figures show two things. Damage in spring or summer weighs several times as much as the same damage in winter. And the time until repair drives the loss more than the value of the material. That is why it pays to look at how quickly an operations manager responds and whether the insurance also covers loss of revenue.

Who bears the loss: contractor, operator or insurer?

That depends on timing. While the park is being built, the risk usually lies with the construction contractor. Under German contract-for-work law, the contractor bears the risk until acceptance (§ 644(1) BGB). If something is stolen before then, it must perform again without charging more. Where the standard construction terms VOB/B are agreed, § 4(5) expressly obliges the contractor to protect completed work against damage and theft until acceptance. The date of acceptance therefore matters; a signed and dated acceptance record belongs in your files.

If you buy a finished park under a purchase agreement, risk passes to you on handover (§ 446 BGB). From then on you are the operator and bear the loss yourself, at least in the first instance. In practice it is borne by the property insurance that belongs to the business. Which policies these are, who the policyholder is and why a claim can fail is explained in the article on insuring a solar park and storage.

The operations manager is liable only if it has breached its own duties, for example missed an agreed response time or overlooked an alarm. What it owes is set out in the operations management agreement. If that says little, there is little to claim.

PhaseWho bears the riskBasis
Construction until acceptanceConstruction contractor§ 644(1) BGB; with VOB/B also § 4(5)
Purchase of a finished parkBuyer from handover§ 446 BGB
OperationOperator, covered by property insuranceInsurance contract
Breach by the operations managerOperations manager, to the agreed extentOperations management agreement
Simplified overview; in each case the contracts decide.

What security is usual and what does the insurer require?

A fence alone is rarely enough. Common practice combines mechanical protection, detection and response. The fence keeps out opportunists and slows the others down. Detection means an intrusion is noticed, for example through sensors on the fence or cameras with image analysis. Response means someone acts on an alert: a security service with an agreed arrival time, or the police. Without that third part, even the best camera only records.

On top of that come structural measures that make the work harder for offenders. Cables can be laid in protective conduits or locked cable ducts. Inverters can be fixed with special screws. Serial numbers of modules and inverters should be documented; that helps both the police and the insurer.

Which measures are mandatory is set by the property insurance, as security conditions in the contract. Anyone who breaches such an obligation through gross negligence risks the insurer cutting its payment; with intent it pays nothing (§ 28(2) VVG, the German Insurance Contract Act). A broken camera that nobody repairs for weeks is such a case. For you this means: ask to see the security conditions of the policy and compare them with what is actually on site.

How quickly is theft noticed?

That depends on monitoring. If the transformer is missing, any operations manager will see the next morning that feed-in is at zero. If the cables of individual rows are missing, output falls only by a part. On a cloudy day this barely shows in the figures for the whole park. Only monitoring at inverter or string level reveals that a section no longer delivers power.

The calculation makes the difference visible. A partial outage of one third that goes unnoticed for ten days in June costs around 450 euros per megawatt before anyone has even commissioned the repair. Ask at what resolution the park is monitored, who reads the alerts and how quickly they must respond. What an operations manager typically reports is described in the article on support and reporting after closing.

What about sabotage and attacks through remote access?

Physical sabotage differs from theft mainly in motive. Damage is done without the aim of taking anything, for instance at the grid connection station or to cables. For the loss and the insurance the same questions apply: whether the policy includes vandalism and malicious damage, and which security it requires.

The second form is an attack over the network. A solar park must be remotely controllable; the grid operator must be able to read its feed-in and reduce its output (§ 9(1) EEG). In addition there is the access of the direct marketer and the remote access of the operations manager to inverters and data loggers. Each of these access points is a possible point of attack. Whoever misuses one can switch a park off.

The statutory IT security obligations do not reach a typical investor park, however. A generating plant counts as critical infrastructure only from 104 megawatts of installed net rated capacity (BSI-Kritisverordnung, Annex 1 Part 2). The German act implementing the EU NIS2 Directive covers operators of generating plants only from 50 employees or more than ten million euros in both annual turnover and balance sheet total (§ 28(2) BSIG). A park of a few megawatts owned by a private investor is far below that. The same applies to the Federal Network Agency's IT security catalogue (§ 5c EnWG). Whatever protection exists is therefore set by contract, not by law. Ask who has remote access, how access rights are granted and logged, and who is responsible for inverter updates.

What are the tax consequences of a theft?

There are three, and one of them surprises many people. First, the loss in value caused by the theft can be deducted as extraordinary depreciation (§ 7(1) sentence 7 EStG), in the year of the damage or at the latest in the year it is discovered. According to case law this applies even if an insurer pays for the damage (H 7.4 EStH, referring to BFH VI R 27/97).

This deduction is excluded for as long as you use declining-balance depreciation (§ 7(2) sentence 4 EStG). Many investors use declining-balance depreciation for assets acquired between July 2025 and the end of 2027. Switching to straight-line depreciation is permitted (§ 7(3) EStG) and opens the way; whether it pays off is a calculation for your tax adviser. The difference between the depreciation routes is described in the article special depreciation or declining-balance depreciation.

Second, the insurance payment is business income. If it exceeds the book value of what was stolen, a gain arises. For tax purposes theft counts as force majeure; the income tax guidelines name it expressly (R 6.6(2) EStR). If a replacement is seriously planned, this gain can therefore be put into a reserve and transferred to the replacement. The details are in the article on insurance.

Third, an investment deduction (IAB) is preserved. Normally a qualifying asset must stay in the business until the end of the following year, otherwise the deduction is reversed (§ 7g(4) EStG). If it leaves because of an event beyond the taxpayer's control, including force majeure, the requirement is deemed met under the Federal Ministry of Finance letter of 15 June 2022 (margin no. 40). For special depreciation under § 7g(5) EStG the statute refers to the same rule; the tax authorities have not expressly confirmed this for special depreciation. When a deduction is otherwise reversed is covered in the article on reversing the IAB.

Which questions should you ask the provider and the operations manager?

  • When is acceptance planned and who bears the risk of theft and damage until then? Is there construction all-risk insurance for this period?
  • Which property insurance applies from handover? Does it include theft, vandalism and malicious damage?
  • Is loss-of-revenue cover in place? From which day does it pay, for how long and on what basis of assessment?
  • Which security conditions does the policy contain? Who checks that they are met on site?
  • How is the park secured: fence, detection, cameras? Who responds to an alarm and how quickly?
  • At what resolution is the park monitored: whole park, inverter or string?
  • What response time does the operations manager owe after an outage? What does a call-out outside the flat fee cost?
  • Who has remote access to inverters and data loggers? How is access granted, logged and revoked?
  • Have there already been thefts in the park or nearby? What has changed since?
  • How long does it take to procure a replacement transformer? Is there an arrangement for it?

Most of these questions are answered by a document: the acceptance record, the policy with its terms, the operations management agreement, the security concept. A provider who cannot or will not show these documents has given an answer of its own. Further checks are collected in the article on recognising a reputable provider.

How we check this in a project review

We read the contracts for the points where risk changes hands: acceptance, handover, start of operations management. For the property insurance we ask to see the terms with the security conditions, not just the certificate. With the operations manager we look at monitoring, response times and the rules for remote access. We model an outage of a few weeks in the revenue so that it is clear what it would cost. We make no return commitments. If you would like to assess an offer from these angles, you can do so with us in a no-obligation initial conversation.


Frequently asked questions

Who pays when cables are stolen from my solar park?

Before acceptance, usually the construction contractor, because it bears the risk until then (§ 644(1) BGB). After that you are affected as the operator; the business's property insurance replaces the physical damage if theft is included and the security conditions were met. Revenue lost during downtime is covered only by loss-of-revenue insurance.

Do I receive EEG payments for the time the park is down after a theft?

No. The market premium is paid for power generated and sold through direct marketing (§ 19 and § 20 EEG). Compensation for lost feed-in exists only where the grid operator curtails the plant (§ 13a EnWG). An outage caused by theft or sabotage is not one of those cases.

What does a day of downtime at a solar park cost?

In our calculation for one megawatt in central Germany at 2025 prices, around 134 euros in June, 80 euros in January and 46 euros in December. Six weeks of total outage from the start of May cost around 6,100 euros per megawatt, just under twelve percent of a year's revenue. The figure depends heavily on site, season and price year.

Are there statistics on theft from solar parks?

No. The German police crime statistics record the stolen good "metal" but not whether it came from a solar park. What is documented are individual cases in police reports, such as the theft of five transformers in the Harz region in spring 2026 worth around 220,000 euros.

Do I lose my investment deduction (IAB) if parts of the plant are stolen?

No. For tax purposes theft counts as force majeure (R 6.6(2) EStR). If an asset leaves early for such a reason, the retention and use requirement is deemed met under the Federal Ministry of Finance letter of 15 June 2022 (margin no. 40). For special depreciation under § 7g(5) EStG the authorities have not expressly addressed this.

Can I claim the theft as extraordinary depreciation?

Under straight-line depreciation, yes (§ 7(1) sentence 7 EStG), even if an insurer pays. Under declining-balance depreciation, extraordinary depreciation is excluded (§ 7(2) sentence 4 EStG); switching to straight-line is permitted. The insurance payment is business income in any case.

Does a privately owned solar park have to comply with critical infrastructure or NIS2 rules?

As a rule, no. Critical infrastructure starts for generating plants at 104 megawatts (BSI-Kritisverordnung). NIS2 covers operators only from 50 employees or more than ten million euros in turnover and balance sheet total (§ 28 BSIG). Protection against misuse of remote access is therefore a matter for the contracts with the operations manager and the direct marketer.

Sources

  1. § 644 BGB, Gefahrtragung (para. 1: risk with the contractor until acceptance)
  2. § 640 BGB, Abnahme (acceptance)
  3. § 446 BGB, Gefahr- und Lastenübergang (passing of risk)
  4. VOB/B 2016 (standard construction contract terms), § 4(5) and § 7, unofficial version
  5. § 19 EEG 2023, Zahlungsanspruch (payment entitlement)
  6. § 20 EEG 2023, Marktprämie (market premium)
  7. § 9 EEG 2023, Technische Vorgaben (para. 1: remote reading and reduction of feed-in)
  8. § 13a EnWG, adjustment of generation and its financial compensation
  9. § 5c EnWG, IT security in plant and network operation
  10. § 28 BSIG, essential and important entities (paras. 1 and 2)
  11. BSIG, Annex 1 (no. 1.1.4: operators of generating plants)
  12. BSI-Kritisverordnung, Annex 1 Part 2 (threshold for generating plants 104 MW)
  13. § 28 VVG, breach of a contractual obligation (para. 2)
  14. § 7 EStG, depreciation (para. 1 sentence 7, para. 2 sentence 4, para. 3)
  15. § 7g EStG, investment deductions and special depreciation (para. 4, para. 6 no. 2)
  16. Official Income Tax Handbook 2025, § 7 EStG with H 7.4 (extraordinary depreciation)
  17. Official Income Tax Handbook 2025, § 6 EStG with R 6.6 EStR (para. 2: theft as force majeure)
  18. Federal Ministry of Finance letter of 15.06.2022 on § 7g EStG (margin no. 40), Official Income Tax Handbook 2025, Annex 18
  19. Bremen state parliament, printed paper 21/1556 of 14.01.2026 (recording of metal theft in the police crime statistics)
  20. Harz police district, press release of 13.05.2026 (theft of transformers from a solar park)
  21. Börde police district, press release of 27.01.2026 (cables cut in a solar park)
  22. European Commission, PVGIS 5.3 (hourly yield data, weather year 2023)
  23. Federal Network Agency, SMARD electricity market data (day-ahead prices 2025, bidding zone Germany/Luxembourg)

Read on

Articles that follow thematically.

Personal first conversation

Less reading: a short call.

30 minutes, free and without obligation. We understand your tax situation and show which project structures fit you, or whether today is (not yet) the right moment.

Learn more