The 750 kWp threshold for rooftop PV in Germany: when a commercial roof needs a tender award and what the award is worth
The statute says 750 kilowatts, the rule actually applied is one megawatt, and the draft EEG 2027 counts on 750 again. For a large commercial roof this threshold decides whether revenue comes from a table or from a bid. With citations, the figures of all twelve rounds since 2023 and our own calculation of what an award is worth.
Jakob HubertPublished 17 November 2026~11 min read
For a photovoltaic system on a logistics hall or a production building, the offer document usually shows one figure in cents per kilowatt hour that is meant to hold for 20 years. Where that figure comes from depends on the size of the system. Up to a threshold it is written in the statute. Above it, the operator has to bid for it in a tender run by the Federal Network Agency; without an award (Zuschlag) there is no market premium.
Where this threshold lies has been confusing since 2024. Many texts name 750 kilowatts because that is what the statute says. The figure has not been applied to this day. For investors this leads to a practical question: does the roof on offer need an award, does it already have one, what is it worth?
From how many kilowatts does a rooftop PV system have to go to tender?
From an installed capacity of more than one megawatt. The wording of the statute says something else: since the Solarpaket I of May 2024, Sec. 22 (3) sentence 2 no. 1a EEG exempts systems on buildings from the award requirement only up to and including 750 kilowatts, and Sec. 30 (2) accordingly requires bids above 750 kilowatts. Both provisions are subject to a reservation, however. Under Sec. 101 (1) EEG they may only be applied after state-aid approval by the European Commission; until then the version of 15 May 2024 with the old limit applies.
That approval has not been granted. The Federal Network Agency therefore states on its page for the second segment that bids are possible for systems of at least 1,001 kilowatts. Its table of statutory rates accordingly runs up to 1,000 kilowatts. Under Sec. 3 no. 41b EEG the second segment covers all solar systems on, at or in a building or a noise barrier.
Rule
Threshold
Status
Sec. 22 EEG (text)
750 kW
suspended
Draft EEG 2027
750 kW
not adopted
Version applied
1,000 kW
in force
Own compilation from Sec. 22 (3), Sec. 30 (2) and Sec. 101 (1) EEG 2023, the Federal Network Agency's page on the second segment and Bundestag printed paper 21/7867. Suspended by Sec. 101 (1) EEG. As of 17.11.2026.
For checking an offer this means: a system of 999 kilowatts commissioned in 2026 needs no award, even if a checklist found online claims the opposite. Conversely, a roof of 1.2 megawatts receives no market premium without an award; the agency disregards a bid for a smaller system (Sec. 22 (5) EEG).
What does a roof receive without an award?
The statutory reference value (anzulegender Wert) from Sec. 48 EEG, tiered by capacity. The tiers apply pro rata (Sec. 23c EEG): the first ten kilowatts receive the highest rate, the capacity above each step the next lower one. The larger the roof, the lower the blended rate. Full feed-in of the electricity earns higher values than feeding in the surplus alongside an on-site supply (Sec. 48 (2a) EEG).
Capacity
Surplus
Full
300 kWp
6.04
9.51
500 kWp
5.96
9.00
750 kWp
5.92
8.55
1,000 kWp
5.90
8.32
Own calculation, cents per kilowatt hour: reference values for the market premium for commissioning from 1 August to 31 December 2026 according to the Federal Network Agency's table, blended pro rata under Sec. 23c EEG. Offer documents often quote the value of a single tier; what counts is the blended rate of the whole system.
How switching between the two columns works is described in the article on PV on someone else's roof. Here the last row is enough: one megawatt on a roof receives 8.32 cents in full feed-in without a tender. Every award has to be measured against this figure.
What is an award worth?
Most recently about one sixth more revenue than the statutory value. With the award, the bidder's own bid value becomes the reference value of the system (Sec. 38h in conjunction with Sec. 38b (1) EEG); each bidder receives what they bid. On the bidding date of 1 October 2026 the awarded bids ranged from 8.50 to 10.00 cents, with a volume-weighted average of 9.67 cents. The maximum value for 2026 is 10.00 cents under a determination by the Federal Network Agency.
We calculated this for a roof with an east-west layout in central Germany: 881 kilowatt hours per kilowatt in the weather year 2023, of which 25.5 percent fall into hours with a negative exchange price in 2025, for which no market premium is paid (Sec. 51 EEG). That leaves 657 remunerated kilowatt hours per kilowatt.
Case
ct/kWh
Euro per kWp
1 MW without award
8.32
54.6
Lowest award
8.50
55.8
Maximum value
10.00
65.7
Average award
9.67
63.5
Own calculation, annual revenue per kWp with full feed-in. Yield from PVGIS (weather year 2023, east-west, 12 degrees), negative hours from SMARD 2025, award values from the bidding date of 1 October 2026. Without the direct marketer's fee, without degradation. Not a forecast.
The gap between the first and the last row is 8.9 euros per kilowatt a year, or roughly 8,900 euros for one megawatt. Discounted at 5 percent over 20 years that is 111 euros per kilowatt. A roof just above the threshold with an average award thus earns more than an identical one just below it. Even the lowest award of the October round was above the statutory blended rate.
The difference is larger when part of the electricity is sold on site. For systems with an award the statute does not distinguish between full feed-in and surplus; the former ban on using the electricity of an awarded system yourself is no longer part of the EEG 2023. The remainder fed into the grid then receives the award value instead of 5.90 cents. At the average of the last round that is 3.77 cents more per kilowatt hour fed in.
How certain is the award?
Since June 2025 no admissible bid has lost out to competition, but many have been excluded. In the five rounds since then the capacity awarded matched the admissible capacity bid exactly: anyone who submitted a flawless bid up to the maximum value received the award. The overview below shows how much of the tendered volume the admissible bids covered and which share of the capacity bid was excluded.
Date
Admissible
Excluded
Avg ct
02/2025
108
7.7
9.10
06/2025
90
6.6
9.22
10/2025
99
9.3
9.66
02/2026
55
12.5
9.56
06/2026
70
12.5
9.72
10/2026
97
16.8
9.67
Own evaluation of the Federal Network Agency's result tables. Admissible: admissible bid capacity as a percentage of the tendered volume. Excluded: excluded bid capacity as a percentage of the capacity bid. Avg ct: volume-weighted award value in cents per kilowatt hour.
On 1 October 2026, 347 megawatts were bid against 296 megawatts tendered. After 34 bids totalling 58 megawatts were excluded, 288 megawatts remained; all of them received the award. Across the twelve rounds since February 2023 the agency excluded 9.3 percent of the capacity bid; in 2026 it was 14.4 percent. It does not publish the individual reasons. Sec. 33 EEG lists as grounds for exclusion, among others, incomplete information, a bid value above the maximum value, and a fee or security contribution that has not been received in full by the bidding date.
For investors this cuts both ways. An award close to the maximum value is the norm in this segment; it does not prove an especially good project. An offer document that counts on a future award, by contrast, carries a procedural risk. If the bid is excluded, the next date follows four months later (Sec. 28b (1) EEG: 1 February, 1 June, 1 October). Nor was the segment always undersubscribed: in 2023 and 2024 bids clearly exceeded the volume, and the average fell as low as 8.92 cents.
Which obligations and deadlines come with the award?
Three: money up front, a fixed location, a running clock. With the bid the bidder pays a project security contribution (Projektsicherungsbeitrag) of 35 euros per kilowatt (Sec. 38d EEG). For 1,001 kilowatts that is 35,035 euros, plus a fee of 451 euros per bid. According to the Federal Network Agency the contribution has to be transferred as a sum of money; a guarantee is not sufficient. In our calculation it equals a good half of one year's revenue.
Without an award the Federal Network Agency returns the contribution. With an award the grid operator refunds it within three months of commissioning; what counts is the capacity that was awarded and actually built (Sec. 38d (6) EEG). If less is built than was bid, the remainder is forfeited.
The award belongs to the location named in the bid. It cannot be transferred to another building, in whole or in part (Sec. 38f EEG). If the roof falls away, for instance because the owner pulls out or the structural reserve is insufficient, the award is worthless.
The bid includes a declaration that the bidder owns the area or bids with the owner's consent (Sec. 38c (2) EEG). Capacity per bid is capped at 20 megawatts.
The statute no longer provides for a penalty for late construction in the second segment; Sec. 55 EEG now names penalties only for other installations. According to the Federal Network Agency, awards in principle expire only after 252 months.
That last point sounds more generous than it is. Payment ends with the 252nd calendar month after the announcement of the award (Sec. 38g EEG), regardless of when the system is connected. Anyone who needs twelve months to build has 240 months of support, that is 20 years. After 18 months 19.5 years remain, after 24 months 19. A system with a statutory value, by contrast, receives 20 years plus the remainder of the year of commissioning (Sec. 25 (1) EEG). Each month of delay costs the awarded system one month of market premium at the end.
The statute leaves open one question that matters for construction planning: whether a rooftop system may be commissioned before the award. For ground-mounted systems Sec. 38a EEG expressly requires commissioning after the award; for buildings there is no such sentence. The Federal Network Agency can, however, exclude a bid if a system is already running on the plot and it suspects that nothing new is planned there (Sec. 33 (2) EEG). Until the award there is no claim to the market premium in any case. Waiting postpones the start by at least four months; if these are June to September, 54.5 percent of a year's yield falls into the waiting period, from October to January it is 9.0 percent.
Can a roof be split to stay below the threshold?
Not by dividing it among several owners. For the size of the system, Sec. 24 (1) EEG adds up several systems if they stand on the same plot, the same building or the same business premises and are commissioned within twelve calendar months. This applies expressly regardless of ownership. Anyone who acquires a third of a 1.5 megawatt roof therefore does not own a 500 kilowatt system for EEG purposes. Their part belongs to a system above the threshold; it receives the award value or no market premium at all.
There has been one exception since the Solarpaket I: systems on buildings that are not operated behind the same grid connection point (Netzverknüpfungspunkt) are not treated as one system (Sec. 24 (1) sentence 4 EEG, for commissioning from 16 May 2024). Two halls with separate grid connections can thus each stay below the threshold, even on the same premises. Whether this holds in an individual case is decided by the grid operator when settling payments. An offer that counts on the statutory value for several sub-systems should therefore name the grid connection point and the commissioning date for each; why the day matters is explained in the article on the commissioning date.
What would the EEG 2027 change?
The threshold would actually fall to 750 kilowatts, and the statutory value below it to 6.2 cents. The government draft (printed paper 21/7867) keeps the 750 kilowatts in Sec. 22 and deletes the current Sec. 101 that suspends them. At the same time the separate values for buildings disappear, together with the supplement for full feed-in; new systems without an award receive a uniform 6.2 cents. In the second segment 1,500 megawatts a year are to be tendered from 2027 to 2032; the maximum value is 9.9 cents in 2027 and falls by one percent a year from 2028.
Case
ct/kWh
Euro per kWp
750 kWp, online 2026
8.55
56.1
Up to 750 kWp from 2027
6.20
40.7
Above 750 kWp, avg 2026
9.67
63.5
Above 750 kWp, maximum
9.90
65.0
Own calculation with the same assumptions as above. Values from 2027 according to the government draft; the award value of 9.67 cents is the average of 1 October 2026 and serves only as an example. The calculation does not model the draft's refinancing contribution.
The jump at the threshold would thus be larger than today. A roof of 750 kilowatts would lose a good 27 percent of revenue compared with commissioning in 2026. A system of 751 kilowatts with an award at the level of the last average would be 22.8 euros per kilowatt a year above it, discounted 284 euros per kilowatt. Roofs between 750 and 1,000 kilowatts, which receive the statutory value today, would need an award in future. Two smaller changes would be added: the security contribution would be refunded in full as soon as at least 95 percent of the awarded capacity has been built. In addition, the draft supplements the market premium with a repayment once the market value exceeds the reference value; this is described in the article on the refinancing contribution.
What does the size mean for tax?
Nothing changes for tax purposes because of the award itself, but the order of magnitude matters. The total of investment deduction amounts (Investitionsabzugsbetrag) is capped at 200,000 euros per business (Sec. 7g (1) sentence 4 EStG). With a share in a large roof this limit is exhausted sooner than with a small system; depreciation continues alongside. The requirements in detail are set out in the article on the IAB requirements.
Which questions should you ask the provider?
How large is the entire system on the building and behind the same grid connection point, not only the part on offer?
Is there an award? If so: at what value, from which bidding date, announced on which day?
If the award has only been applied for: on which date will the bid be made, which value does the offer document assume, what happens if the bid is excluded?
Who paid the project security contribution, and who receives the refund?
When will the system be connected, and how many of the 252 months remain after that?
If the offer document uses a statutory value: is it the blended rate of the whole system or the rate of a single tier?
Does the capacity built match the capacity awarded? Does the location match the bid?
If the system is only commissioned in 2027: under which law has it been calculated? What would revenue look like at 6.2 cents?
Each of these questions can be answered with a document: the award notice, the Federal Network Agency's announcement, the extract from the core energy market data register (Marktstammdatenregister). Further warning signs are collected in the article on recognising a reputable provider.
How we check large roofs in our project check
We start with the capacity of the entire system and the commissioning date, because both determine which rule applies. We recalculate the statutory value as a blended rate ourselves. Where there is an award, we ask to see the notice and the announcement; from these follows the day on which the 252 months end. If the award is still pending, we also calculate revenue without it. We make no return promises. If you would like to assess a specific offer for a commercial roof, you can do so with us in a non-binding initial call.
Frequently asked questions
Does the limit of 750 kWp or of one megawatt apply to rooftop PV?
One megawatt is applied. The statute has named 750 kilowatts since 2024 (Sec. 22 (3) sentence 2 no. 1a EEG), but the provision may only apply after state-aid approval (Sec. 101 (1) EEG). The Federal Network Agency therefore accepts bids from 1,001 kilowatts. The draft EEG 2027 would introduce the 750 kilowatts.
How high was the most recent award for rooftop systems?
On the bidding date of 1 October 2026 the volume-weighted average was 9.67 cents per kilowatt hour, and the awarded bids ranged from 8.50 to 10.00 cents. The maximum value for 2026 is 10.00 cents. 143 bids totalling 288 megawatts were awarded.
What does taking part in the tender cost?
A fee of 451 euros per bid and a project security contribution of 35 euros per kilowatt (Sec. 38d EEG), which is 35,035 euros for 1,001 kilowatts. The contribution has to be transferred as a sum of money. Without an award it is returned; with an award the grid operator refunds it after commissioning for the capacity built and awarded.
How long is a rooftop system with an award supported?
Until the end of the 252nd calendar month after the announcement of the award (Sec. 38g EEG). That is 21 years from the award, not from commissioning. If the system is connected twelve months later, 20 years remain; each further month of construction shortens support by one month.
Is there a deadline by which the system must be built after the award?
The EEG no longer contains a construction deadline with a penalty for the second segment. According to the Federal Network Agency, awards in principle expire only after 252 months. The pressure comes from the payment period, which runs from the award, as well as from the security contribution, which is tied up until commissioning.
May a system with an award supply electricity on site?
The EEG 2023 no longer contains a ban on using or selling the electricity of an awarded system on site. The award value then applies to the part fed into the grid. What else to consider for a supply inside the building is described in PV on someone else's roof: what investors should check on commercial rooftops.
Can I treat a share in a large roof as a small system of my own?
Not for EEG purposes. Systems on the same building or plot that are commissioned within twelve months count as one system regardless of the owner (Sec. 24 (1) EEG). Building-mounted systems are only considered separately if they are operated behind different grid connection points.
What happens to roofs between 750 and 1,000 kilowatts if the EEG 2027 arrives?
Under the government draft they would need an award if commissioned from 2027. Without one there would be no market premium; up to 750 kilowatts the draft provides a uniform 6.2 cents. Systems commissioned before 1 January 2027 remain under the previous law. The draft has not been adopted.
30 minutes, free and without obligation. We understand your tax situation and show which project structures fit you, or whether today is (not yet) the right moment.