Germany's innovation tender: what the award is worth for a solar park with storage
Germany's innovation tender (Innovationsausschreibung) supports solar parks that come with a battery storage system. The draft of the EEG 2027 abolishes it; the awards from 2024 to 2026 remain valid and will reach the market as direct investments until 2029. This article calculates what such an award brings in euros, what the mandatory storage may do and what the market premium depends on.
Jakob HubertPublished 16 November 2026~12 min read
Offers for solar parks with battery storage often contain one short sentence: award from the innovation tender. Behind it is a separate support segment of the German Renewable Energy Sources Act (EEG) with its own rules. The award value is higher than in the ordinary tender for solar parks. In return the park needs a storage system that may only charge electricity from the park itself.
The segment is being phased out. The government draft of the EEG 2027 deletes it; the bid date of 1 September 2026 would then have been the last. The awards already granted run for 20 years. For investors the procedure therefore matters less than the value such an award has today.
What is the innovation tender?
A separate tender segment of the EEG for plant combinations (§ 39n EEG and the Innovation Tender Ordinance, InnAusV). The Federal Network Agency (Bundesnetzagentur) only accepts bids for combinations there: several renewable energies, or a generation plant with storage, feeding in through a shared grid connection point (§ 2 no. 1 and § 4 of the ordinance). In practice these are solar parks with battery storage; in both rounds of 2026 all awards went to this combination.
Such a park differs from a park with an award from the ordinary tender in five respects:
Payment: sliding market premium for 20 years, measured against the annual market value for solar. For electricity that was stored in between, the quantity the storage feeds into the grid counts (§ 8 (2) to (4)).
Negative prices: if the spot market price is negative, the applicable value falls to zero (§ 9).
Mandatory storage: its capacity in megawatts must be at least 25 percent of the total installed capacity of the combination; its energy capacity must last for two hours at rated power. An environmental verifier confirms this to the grid operator every year (§ 13 (2)).
Own electricity only: the storage may only take up electricity generated by the other parts of the combination (§ 13 (4)).
Deadline: the award lapses 30 months after its announcement to the extent the combination is not in operation by then. A security of 60 euros per kilowatt had to be provided for the bid (§ 13 (1), § 6 (4)).
If the storage counts towards the total capacity, as the wording suggests, a park of 1 megawatt needs around 0.33 megawatts of storage power and 0.67 megawatt-hours of capacity. We use this minimum size in the calculation below. Awards from bid dates before December 2022 follow an older model with a fixed market premium (§ 19 (1) of the ordinance); they are not the subject here. How the sliding market premium works in general is explained in Direct marketing and the market premium: how a solar park earns its money.
How many parks with an innovation award are still coming to market?
The six bid dates of 2024 to 2026 produced awards for around 3,000 megawatts, spread over 214 bids. The Federal Network Agency does not report how many of them have already been built. The deadlines, however, can be read off: awards from May 2024 lapse on 10 January 2027, those from September 2026 on 6 April 2029. The parks must be in operation by then. In the older rounds from 2020 to April 2022, 90 to 99 percent of the awarded volume was built according to the agency's figures.
Date
Volume
Value
Regular
May 2024
512
8.33
5.11
Sep 2024
587
7.09
5.05
May 2025
488
6.15
4.66
Sep 2025
490
5.31
4.84
May 2026
482
5.34
4.94
Sep 2026
480
5.14
4.79
Federal Network Agency, results of the innovation tenders and of the tenders for solar installations of the first segment, retrieved on 16 November 2026. Volume: awarded volume in megawatts. Value: average volume-weighted award value of the innovation tender in cents per kilowatt-hour. Regular: the same value of the preceding regular tender for solar parks (March before May, July before September).
The table shows what has become of the mark-up. In May 2024 the average award value was 3.22 cents above that of the regular tender, in September 2026 only 0.35 cents. Competition was fiercest in 2025: bids for 2,020 and 2,182 megawatts were submitted for 486 megawatts per round. For 2026 the maximum value fell from 9.00 to 7.13 cents; bids came to 749 and 678 megawatts for 475 megawatts each. By region, Bavaria led in September 2026 with 177 megawatts, ahead of Brandenburg with 94 and North Rhine-Westphalia with 48 megawatts.
What is the higher award value worth in euros?
Little, if the award dates from 2026: around 2.60 euros per kilowatt of park capacity a year. That is the result of our calculation for a 1 megawatt park in central Germany, modules facing south at a 25 degree tilt, valued at the day-ahead prices of 2025. The reason lies in the mechanics of the market premium. It only closes the gap between the award value and the annual market value for solar. The annual market value was 4.508 cents in 2025. With an award value of 4.79 cents, 0.28 cents of premium remain; with 5.14 cents it is 0.63 cents.
We compare three parks: one with a regular award and no storage, one with an innovation award and mandatory storage of minimum size, and one with a regular award and the same storage, which may also charge grid electricity. The storage runs at most one cycle a day at 86 percent efficiency, knows the day's prices in advance and trades on the day-ahead market only. Costs of construction, operation and marketing are not deducted.
Euros per kWp
2024
2025
Regular award, no storage
53.9
52.7
Regular award, storage with grid electricity
74.1
75.5
Innovation award, mandatory storage
72.3
73.6
Own calculation (scripts/innovationsausschreibung-model.mjs). 1 MWp park, location 51° north, 10° east, weather year 2023 from PVGIS, hourly prices from SMARD, official annual market value for solar. Storage 0.33 MW with 0.67 MWh. Regular award 4.79 cents, innovation award 5.14 cents. Grid electricity under the demarcation option. Revenue before all costs in euros per kilowatt of park capacity and year, rounded. Assumptions, not a forecast.
In 2025 the park with an innovation award earns around 20,800 euros per megawatt more than the park without storage. Of this, 2,600 euros come from the higher award value and 18,200 euros from the storage. The award value alone raises revenue by 5 percent. For 2024 the picture is the same, with 2,900 and 15,500 euros.
Discounted at 5 percent over 20 years, the additional revenue has a present value of around 260 euros per kilowatt of park capacity. Allocated to the storage, that is around 390 euros per kilowatt-hour of capacity. This is the most that the storage, its installation, operation and a later replacement may cost together for the package to pay for itself in this calculation. The figure is an upper limit under favourable assumptions: constant prices, perfect foresight, no ageing.
What may the mandatory storage do and what does the ban on grid electricity cost?
It may only charge electricity from its own park. In our calculation that costs around a fifth of the storage revenue. In 2025 the mandatory storage brings around 54,600 euros per megawatt of storage power. The same storage at an ordinary park that may also charge grid electricity reaches 68,400 euros. With grid electricity, 61 percent of the charged quantity comes from the grid.
Measured against the park, the mandatory storage thus forgoes around 4,600 euros per megawatt and year. The higher award value makes up a good half of that. On balance the park with an innovation award from September 2026 is around 2,000 euros per megawatt and year behind a park with a regular award and storage of the same size using grid electricity. In this calculation an award from 2026 is therefore no longer an advantage over the route the EEG now opens to every park.
That route is the demarcation option (Abgrenzungsoption), which has been applicable since the Federal Network Agency's determination of 1 October 2026; details are in retrofitting battery storage at a solar park. Parks with an innovation award are excluded from it. Two qualifications belong to the comparison: until 30 September 2027 the demarcation option requires the consent of the grid operator and the metering point operator. In addition, storage at a regular park is voluntary; at a park with an innovation award it is a condition of the support.
What the mandatory storage achieves shows in the hours with negative prices. In 2025, 25 percent of generation in our profile fell into such hours. Without storage this quantity is curtailed in the calculation. The mandatory storage takes up around a quarter of it and sells it in the evening. It runs 313 cycles a year; from October to February a cycle succeeds on 97 of 151 days. On the others the solar electricity is not enough for charging or the price spread does not pay. What negative prices mean for parks without storage is covered in Negative electricity prices: what they mean for solar and storage investors.
Why does the bid date decide the value of the award?
Because the award value applies for 20 years and fell by more than 3 cents between May 2024 and September 2026. In our calculation the same park with the same storage earns around 99 euros per kilowatt and year with an award from May 2024 and around 74 euros with one from September 2026. That is 34 percent more at the same exchange prices.
Date
Value
Total
Premium
May 2024
8.33
98.7
30.1
Sep 2024
7.09
88.9
20.3
May 2025
6.15
81.5
12.9
Sep 2025
5.31
74.9
6.3
May 2026
5.34
75.2
6.6
Sep 2026
5.14
73.6
5.0
Own calculation (scripts/innovationsausschreibung-model.mjs) with the prices of 2025 and the average award value per bid date (Federal Network Agency). Value: award value in cents per kilowatt-hour. Total: revenue of the park with mandatory storage in euros per kilowatt of park capacity and year before all costs. Premium: the part of it that comes from the market premium. An individual award deviates from the average.
The last column shows how much of the revenue is secured by law. With an award from May 2024, 31 percent of revenue comes from the market premium; with one from September 2026 it is 7 percent. The rest depends on the exchange price in both cases. If the annual market value for solar rises above the award value, the premium ceases; the park then sells at the market price and keeps the additional revenue under the current law. How much the market value fluctuates is shown in Solar market value: why solar power is worth less and less on the exchange.
For reviewing an offer this gives a simple order. First the bid date and the specific award value, because the range of awards in September 2026 alone ran from 4.50 to 5.40 cents. Then the date on which the award lapses. An award from May 2024 is only worth something if the park is in operation by 10 January 2027.
What happens if the storage no longer proves the minimum size?
Then the market premium falls to zero (§ 13 (2) of the ordinance). The ordinance does not say explicitly for what period this applies. Assuming one year, it costs around 5,000 euros per megawatt of park capacity with an award from September 2026 and around 30,000 euros with one from May 2024. The higher the award value, the more depends on the proof.
Ageing works against the proof. If a storage system loses 2.5 percent of capacity a year, it has 78 percent left after ten years and 60 percent after 20 years. This is a calculation assumption, not a manufacturer's figure; details on ageing are in The battery as a real asset: lifespan, degradation and warranties of a grid-scale storage system. Whether the rated capacity at commissioning is sufficient for the proof or the actual capacity in the year of verification counts is left open by the wording. In the second case a storage system would need 29 percent more capacity at the outset to hold the two hours for ten years. The alternative is a later extension.
Then there is the term. According to the Federal Network Agency's guidance, the combination must remain installed for the entire support period, otherwise the support ceases. If the storage does not last 20 years, its replacement belongs in the calculation. The revenue forecast should contain a reserve for this.
What does the EEG 2027 change for existing awards?
Under the draft, nothing about the support itself. The government draft deletes the innovation tender for the future: § 39n EEG will govern resilience tenders, and the Innovation Tender Ordinance is to expire on 1 January 2027 instead of at the end of 2028. The explanatory memorandum gives two reasons. Combinations of generation and storage have become established as standard. And the ordinance sets the wrong incentives because the storage may only charge electricity from its own combination.
For parks with an award the principle of grandfathering applies. Under § 100 (1) of the draft the EEG as in force on 31 December 2026 remains applicable if the applicable value was determined at a bid date before 1 January 2027. The bid date is decisive, not commissioning. A park with an innovation award therefore keeps the one-sided market premium and pays no refinancing contribution, even if it only goes online in 2028. What this contribution means for new parks is covered in EEG 2027: what the refinancing contribution means for a solar park direct investment.
Grandfathering also means that the storage stays bound. The explanatory memorandum states that arbitrage and the demarcation option are ruled out for combinations with an innovation award. Two points are open on our reading. First, § 100 of the draft only names the EEG; how the ordinance continues to apply to granted awards after its expiry is not stated there explicitly. Second, the extension of the support period by periods of negative prices (§ 51a EEG) is tied to § 51 EEG, while the ordinance has its own rule in § 9. Whether the extension also applies to innovation awards is something the provider should document.
What speaks against a park with an innovation award?
Above all that the storage remains bound to the rules of the ordinance for 20 years while the market for storage keeps developing. In detail:
The mark-up is small for recent awards. 0.35 cents per kilowatt-hour do not carry the mandatory storage; it has to pay for itself by shifting solar electricity.
The storage may not charge grid electricity. On the wording this also rules out services in which it takes up electricity from the grid, such as negative balancing power.
From October to February the storage runs no cycle on a good third of the days in our calculation.
The market premium of the whole park depends on the annual proof for the storage. A defect or faster ageing then also affects the solar electricity that was never stored.
The combination must remain installed for 20 years. A replacement of the storage is likely; doing without it is not possible without losing the support.
Which questions should you ask the provider about a park with an innovation award?
Which bid date does the award come from? What is the award value of this bid, not the average of the round?
When was the award announced and when does it lapse? How reliable is the commissioning date?
What power and capacity does the storage have? How much reserve is there above the minimum size?
Who prepares the annual confirmation by the environmental verifier? Is the first one already available?
What does the revenue forecast assume for the storage: only solar electricity from the park, or also grid electricity and balancing power?
What ageing is assumed? Does the calculation include a reserve for extending or replacing the storage?
How is it settled who bears the consequences if the proof fails in a given year?
Is there a legal assessment of how the ordinance continues to apply to this award after 2026?
How we assess parks with an innovation award in project review
We ask to see the award notice and calculate with the value of this bid, not with the average of the round. We then compare the storage size with the minimum requirement and check whether the revenue forecast runs the storage on solar electricity from the park only. If it contains grid electricity or balancing power that requires taking electricity from the grid, the forecast does not match the support. Finally we look at what ageing is assumed and whether a reserve for the storage is planned. That is exactly what we review in a no-obligation initial consultation. We do not give return guarantees.
Frequently asked questions
What is the German innovation tender?
A tender segment of the EEG in which the Federal Network Agency supports plant combinations, in practice solar parks with battery storage. The award secures a sliding market premium for 20 years. The basis is § 39n EEG and the Innovation Tender Ordinance (InnAusV).
How large must the storage be in the innovation tender?
Its power must be at least 25 percent of the total installed capacity of the combination, and its capacity must last for two hours at rated power (§ 13 (2) of the ordinance). If the storage counts towards the total capacity, that is around 0.33 megawatts and 0.67 megawatt-hours per megawatt of park capacity. An environmental verifier confirms compliance every year.
May the storage charge electricity from the grid?
No. Under § 13 (4) of the ordinance it may only take up electricity generated by the other parts of the combination. The demarcation option, which has allowed other parks to mix grid and solar electricity in the storage since October 2026, is not open to parks with an innovation award.
How high were the latest award values of the innovation tender?
In September 2026 the average award value was 5.14 cents per kilowatt-hour, with a range from 4.50 to 5.40 cents. In May 2026 it was 5.34 cents, in May 2024 still 8.33 cents. The regular tender for solar parks came to 4.79 cents in July 2026.
Does a park with an innovation award pay off more than an ordinary solar park?
That depends on the bid date. In our calculation with 2025 prices, an award from September 2026 including mandatory storage brings around 74 euros per kilowatt and year before costs, a park without storage around 53 euros. The difference comes almost entirely from the storage, which also has to be paid for. An award from May 2024 reaches around 99 euros.
What happens to existing awards when the innovation tender is abolished?
Under § 100 (1) of the government draft of the EEG 2027, the current law continues to apply to awards from bid dates before 1 January 2027. The park keeps its market premium and pays no refinancing contribution. The storage remains bound to the existing rules. The act had not been passed as of 16 November 2026.
By when must a park with an innovation award go into operation?
Within 30 months of the announcement of the award, otherwise it lapses (§ 13 (1) of the ordinance). For the bid date of May 2024 the deadline ends on 10 January 2027, for September 2026 on 6 April 2029.
What does it cost if the storage fails the proof?
The market premium then falls to zero. In our calculation that is around 5,000 euros per megawatt of park capacity for one year with an award from September 2026 and around 30,000 euros with one from May 2024. That is why the reserve above the minimum size, the assumed ageing and a reserve fund for the storage matter.
30 minutes, free and without obligation. We understand your tax situation and show which project structures fit you, or whether today is (not yet) the right moment.